Order this morning. Pour today.

Same-day ready mix from our Lavon plant. One call covers mix, pump, and drill.

0

Ready mix trucks on call

2023

Own plant opened in Lavon

3000-6000

PSI range, specified per job

1

Dispatch line for mix, pump, drill

Lavon batch plant

Concrete for every stage of the job.

Tell dispatch the PSI and the window. We batch at the plant and roll the same day.

Ready mix concrete pouring from a chute
3000-6000 PSI

01 / Structural

Ready mix concrete

Specified for streets, foundations, and custom pours across North Texas.

Stacked fiber reinforced slabs

02 / Durability

Fiber reinforced mix

Enhanced durability for structures that take traffic, weather, and time.

Interlocking concrete block

03 / Site work

Concrete blocks

Interlocking units for walls, bins, and containment. Built to stack and stay.

Before the plant, there were two drivers.

Yudiel and Reinier learned concrete from the cab, then built the company one truck at a time.

Co-founders Yudiel Canizares and Reinier Gomez
Yudiel and Reinier in front of a Potros mixer truck

20trucks in the fleet

The first truck

Two Cuban immigrants turned industry experience, faith, and a clear plan into the first Potros truck.

From one cab to a fleet

The operation grew around the same idea: answer the phone, know the job, and keep the pour moving.

The Lavon plant opens

Potros moved from hauling concrete to batching it, with its own plant and a 20-truck fleet.

Potros in motion

From the plant to the final pass.

Real footage from the Lavon operation: the fleet staged for dispatch, mixes controlled at the batch plant, and crews placing concrete after dark.

01 / Fleet readiness

Twenty trucks. One dispatch line.

The Lavon fleet staged and ready to move concrete across North Texas.

02 / Batch control

Every mix starts with precision.

Plant controls turn job specifications into a consistent load.

03 / Night placement

The pour keeps moving after dark.

Coordinated trucks and field crews carry the work through the final pass.

One dispatch line. More of the job covered.

Select a service to see how it fits the job.

Finishers troweling a residential slab

How a load moves

Four movements. One continuous pour.

The quality of a pour depends on what happens before the chute opens. Potros keeps batching, dispatch, placement, and finishing connected.

  1. 01 / Batch

    Load the right mix.

    Every truck starts at the Lavon plant with the specified PSI, volume, and job requirements confirmed before departure.

    3000 to 6000 PSI / Plant controlled
  2. 02 / Dispatch

    Roll on the pour window.

    Dispatch coordinates the mixer, pump, and field timing so the load arrives when the site is ready to receive it.

    One call / Mix, pump, and drill
  3. 03 / Placement

    Place without breaking rhythm.

    Truck and pump coordination keeps concrete moving steadily from the drum into the prepared forms.

    Continuous placement / Coordinated equipment
  4. 04 / Finish

    Close with a clean final pass.

    Finishers work the surface while the mix is live, bringing the placement to grade and preparing it for cure.

    Field execution / Final surface control

Proof is in the pour.

Recent work across North Texas, shown at the scale it deserves.

Crew pouring a subdivision street in Wylie

Subdivision street paving

Concrete supply for an active development in Wylie, Texas.

Concrete pump boom over residential foundation pads

Residential foundation

Mix and pump coordination for foundation work.

Mixer and pump working during a driveway pour

Custom driveway pour

Concrete delivery for a custom home driveway.

Two concrete pump booms placing a residential foundation

Dual-boom foundation placement

Mixers and pump equipment coordinated across an active residential site.

Finishers hand-troweling fresh concrete flatwork

Hand-finished flatwork

Detail work completed while the concrete is live and ready for its final pass.

Concrete crew placing and leveling a slab at night

After-dark slab placement

Continuous concrete supply supporting a coordinated nighttime crew.

Ready mix concrete flowing from a mixer chute

Ready mix delivery

Job-specified concrete delivered from the Lavon plant to the point of placement.

Truck-mounted drilling rig prepared for pier work

Pier drilling support

Site drilling in the width and depth required before concrete placement.

After-dark capability

The schedule does not always stop at sunset.

When the job calls for a night placement, Potros keeps the plant, trucks, equipment, and field sequence aligned under one dispatch plan.

20 trucks available 1 coordinated dispatch line
Plan the pour
Active night placement North Texas
The Potros Concrete LLC team standing together in front of the plant and fleet

The people behind every load.

Founders, office, sales, dispatch, and field. The crew stays close to the work and close to the phone.

Meet the team

Ready to schedule the pour?

Call dispatch.

945-546-1300
Direct orders Reinier 786-878-9826
Office Talina 469-314-6693
Plant

12350 State Hwy 205
Lavon, TX 75166